Water tank installation works at South Ruislip Vent Shaft

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-Works-1-20/03/2025

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip Vent Shaft site
Contractor
SCS JV
Type of works
Concrete break out, Construction
Estimated Start Date
07/04/2025
Estimated End Date
16/05/2025

What we are doing

From 7 April to 16 May 2025, we will begin works to install the attenuation water tank at South Ruislip Vent Shaft. The attenuation water tank is used to capture excess surface water such as rain.

We will cut the old concrete and lift it out. As we dig down, we may need to also break the concrete which could be disruptive. You may experience increased construction noise during these works.

We’ll use noise reducing barriers around the construction machinery where possible. Noise and vibration monitoring will be in place throughout these works.

For further details please follow the link to the notification below.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk

View all work items near this location
TBM: ElizabethTBM: AnneTBM: Mary AnnTBM: Dorothy (first tunnel drive complete)TBM: Dorothy (second tunnel drive complete)TBM: Cecilia (tunnel drive complete)TBM: Florence (tunnel drive complete)TBM: Sushila (tunnel drive complete)TBM: Caroline (tunnel drive complete)TBM: EmilyTBM: Lydia (tunnel drive complete)
Leaflet | Powered by Esri Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community